Thomas Jäger
Managing Director
INP Schweiz AG
Spinnereistrasse 3
5300 Turgi
Switzerland
Tel. +41 56 552 19 00
thomas.jaeger@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: St. Prex, Switzerland
Services: Project management, Quality assurance, Pre-project planning and tendering, Basic-engineering and pre-engineering, Detail engineering, Installation supervision
Industry Branch/Type of Plant: Transmission & Distribution, Chemical plants
Client: Vetropack St. Prex
Project Size: > 500.000 SFr.
In the glass factory of St. Prex, the previous glass melt furnace was replaced with a highly modern system from January 2006 to April 2006. At the same time, three new storage buildings for a total of 47,000 pallet locations were built to optimize logistics. Including the expansion of the shard preparation system, which has already been completed, the investment for renovating the St. Prex glass factory totaled 36 million Swiss franks. Under these new conditions, a new power station had to be defined and planned in advance, with individual components such as transformers, MV system, and LV system.
INP Switzerland supported Vetropack, with the goal of obtaining a power station and medium-voltage system that met the latest state of the art and all current regulations.
Working closely with the customer, the following tasks were implemented:
Detail drawings had to be generated for the power station, under consideration of all applicable regulations. They included:
Additional work for the switching system:
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.