Michael Ohmer
Head of Energy and Heat Supply
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
michael.ohmer@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Helgoland, Germany
System/Technology: Hydrogen, LOHC, waste heat utilization, heat extraction and integration
Services: Solution development / Feasibility studies
Industry Branch/Type of Plant: Green Energy, Power Generation
Client: Versorgungsbetriebe Helgoland GmbH (local utility operator)
Activity period: 2021 - 2022
The TransHyDE project Helgoland, funded by the German Federal Ministry of Education and Research, focuses on the hydrogen transport technology „LOHC“. In this research project, nine partners from science and industry have networked with the island of Helgoland to develop a LOHC-based supply chain for green hydrogen produced offshore. The route of the supply chain runs from the Schleswig-Holstein coastal sea via the port of Helgoland to the port of Hamburg and thus to hydrogen consumers in the metropolitan region and beyond. In the LOHC supply chain, Helgoland is considered as the place of storage (hydrogenation) and Hamburg as the place of release (dehydrogenation).
The basis for this originally came from the AquaPortus project, which is part of the AquaVentus project family. After the research phase, the project was to be implemented in AquaPortus.
The aim of this study is to investigate the technical and economic feasibility of using waste heat from the LOHC plant (hydrogenation) and the CO2 reduction that this could bring to heat generation for Helgoland.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.
Further information regarding cookies in this website can be found in our privacy policy