SHARE

We wish you a merry and
joyful Christmas Season
and a good start into the
New Year!

  • Strong amongst German SMEs

    We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.

    Georg Jester – General Manager
  • Green Energy Geothermie
  • Focus on our customers

    Professionalism and reliability are what our customers appreciate. And this has been so for over 30 years.

    Andreas Haaß – Managing Director
  • HGÜ HVDC Offshore Sylwin
References   /  Son Reus II – Gas and Steam Power Plant
Son Reus II – Gas and Steam Power Plant

Son Reus II – Gas and Steam Power Plant

Location: Son Reus, Mallorca, Spain

System/Technology: ABB Advant AC 160 and AC 450, OS 500

Services: Commissioning, Project management, Basic-engineering and pre-engineering, Detail engineering

Industry Branch/Type of Plant: Power Generation, Power plants

Client: SIEMENS

Project Size: EUR 600,000

200 MW Gas and steam power plant

  • Fuel: Diesel
  • Gas turbine 2xGE Frame 6FA, each 74MW
  • Steam turbine ST8 with 78MW

Project description

When the Balearic power grid was nearing collapse in 2003, the local energy provider GESA, a subsidiary of ENDESA decided to build a gas and steam power plant on Mallorca, with a capacity of about 220MW.

INP services

  • Hardware engineering for steam turbine regulation and controls
  • Hardware engineering for the turbine monitoring enclosure
  • Controls enclosure manufacture
  • Commissioning of regulator and controls for the turbine
  • Commissioning of auxiliary devices for turbine protection
  • Commissioning of vacuum system and condenser

Points of contact

Jürgen Wilkening Prokurist - Business Development Manager

Jürgen Wilkening

PoA - Business Development Manager

INP Deutschland GmbH

Werkstrasse 5

67354 Römerberg

Germany

Tel. +49 6232 6869-0

juergen.wilkeningnoSpam@noSpaminp-e.com

More references