Ingo Wagner
Business Development Transmission & Distribution
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
ingo.wagner@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Rickenbach/Laufenburg, Germany
System/Technology: Outdoor switchboard 220/380-kV
Services: Project management, Installation supervision
Industry Branch/Type of Plant: Transmission & Distribution
Client: Schluchseewerk AG
Project Size: 400,000 EUR
The Kühmoos substation is an important node in the extra-high voltage grid and serves as a feed-in point for the pumped-storage plants in Bad Säckingen (220 kV, 360 MW) and Wehr (380 kV, 960 MW). It is jointly operated by TransnetBW GmbH, Schluchseewerk AG and Amprion GmbH. The plant was built in 1966/67 and upgraded in several stages. The respective companies own their individual fields which they operate and maintain on their own.
Since many components at the Schluchseewerk plant date back to the construction of the plant and due to significantly changed requirements for grid operation, the owners decided to modernize the primary and secondary equipment of their own fields between 2018 and 2022. This will be carried out in four construction phases and in parallel to revision services in the associated pumped-storage plants.
The goal of the project is to modernize the six machinery lines and two transverse couplers owned by Schluchseewerk AG from top to bottom and get them ready for the coming decades. This upgrade is planned in four construction phases, which are distributed over the two voltage levels from 2018 to 2022, including the detail planning.
Concerning the machinery lines and transverse couplers, the complete primary equipment (isolators, ground electrode, transformer sets, supports, and foundations) will be replaced by new devices, with the exception of the already renewed circuit breakers. The goal is to get the switchboard panels ready for the coming decades and to adapt the technology to current requirements for short-circuit resistance and availability.
Concerning the secondary equipment, existing, partly proprietary technology will be replaced with state-of-the-art field control devices to ensure interoperability with the other fields and power grid systems of the operators. At the same time this will end dependency on already discontinued components. Concurrently, the station power supply will be restructured and adapted to the ownership rights of the plant. As part of installing the new secondary equipment, the connection to the new power grid system of Schluchseewerk AG and the interfaces to the other operators will also be redesigned. Existing control systems components will be removed and replaced by modern systems.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.