Thomas Jäger
Managing Director
INP Schweiz AG
Spinnereistrasse 3
5300 Turgi
Switzerland
Tel. +41 56 552 19 00
thomas.jaeger@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Qassim, Saudi Arabia
System/Technology: ABB Procontic, SCADA system, frequency converter LCI
Services: Commissioning, Project management, Basic-engineering and pre-engineering, Detail engineering, Installation supervision
Industry Branch/Type of Plant: Large Plants, Industrial systems
Client: SWCC, Saudi Arabia by ABB Utility Automation
Project Size: SFr 1 m
In 1985, the Saline Water Conversion Corporation (SWCC) ordered two pumping stations and five terminals from the former BBC in order to provide drinking water supply in the region of Qassim, Saudi Arabia. Following a lengthy interruption, the project was continued by ABB in 2001. The scope of delivery by ABB included medium and low-voltage systems, static frequency converters, 32 medium voltage motors, process control and monitoring as well as the telecommunications system.
INP Switzerland supported ABB to a significant extent in successfully implementing the project, and with its knowledge of BBC technology (which was no longer available at ABB), succeeded in achieving the "mechanical completion" milestone on schedule. INP Switzerland provided two commissioning engineers, one site manager and a deputy project manager. The plant has been in commercial operation since 2003. The final acceptance certificate was issued in 2005.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.