Michael Ohmer
Head of Energy and Heat Supply
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
michael.ohmer@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Speyer, Germany
System/Technology: SCADA-System
Services: Commissioning, Project management, Quality assurance, Documentation, As-built status and data recording, Pre-project planning and tendering, Basic-engineering and pre-engineering
Industry Branch/Type of Plant: Transmission & Distribution
Client: Stadtwerke Speyer GmbH (local utility operator)
Activity period: 2017-2022
Stadtwerke Speyer reliably supplies its customers with electricity, natural gas, heat and fresh drinking water. To maintain an uninterrupted supply, they effectively use a SCADA System for combined energies supply. The entire network management of all supply lines is carried out via the SCADA systems. Faults are efficiently localized and eliminated.
The existing network control system was to be modernized and expanded. A special feature here was the installation of a joint interconnected network control system for Entsorgungsbetriebe Speyer and Stadtwerke Speyer.
For this project, INP carried out the planning of the network control system and the supervision of its implementation (HOAI LPH 1 to 8).
In the early planning phase, INP carried out requirements management, held oneon- one meetings with the technical staff of Stadtwerke Speyer, and recorded the requirements for the new network control system to be planned. A market survey and discussions with potential suppliers enabled the current technical possibilities to be identified. The basis for the planning of the new network control system was a survey of the current situation and close coordination with the client. In this way, the required functions were described and a specification sheet was drawn up for the invitation to tender.
The project volume required the execution of a European tender. In this process, INP planned the tender, evaluated the documents submitted, conducted the technical and commercial negotiations, and managed the award process.
From the start of the project, INP was responsible for coordinating and managing project implementation in accordance with the requirements and contractual documents. INP was responsible for technical and contractual supervision throughout the commissioning phase, trial operation, acceptance, and beyond.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.