INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Darmstadt, Germany
System/Technology: PCS7 V9.0 with CPU 410H and ET200SPHA periphery, E-Plan P8
Services: Production monitoring, Commissioning, Project management, Documentation, As-built status and data recording, Basic-engineering and pre-engineering, Detail engineering, Installation supervision, Operations, Maintenance, Training
Client: Merck KGaA Darmstadt
The Merck Pharma location in Darmstadt operates a generation and supply facility for its own as well as the surrounding area’s process and service water requirements. It consists of 42 raw water wells and central water treatment systems with corresponding distribution facilities.
The control systems of this service water system was divided between two different systems: Siemens S7 V5.5 with WinCC V7.0 and IDS Highleit. They were connected to each other via a partly outdated infrastructure. The system technology has been discontinued in places and thus had to be replaced to ensure continued reliable operation. Furthermore, a central and uniform control/operation/monitoring concept had to be integrated into the already existing process control system PCS7 V9.0, using standardized Siemens libraries APL and IL, special customer-specific proprietary libraries, and SFC types.
The actuators, sensors, controllers, tanks, wells, and their infrastructure are distributed throughout and outside the plant and were linked via existing conventional cable connections. They should be used for modern and new state-of-the-art bus connections, partly also with transmission via DSL technologies due to the very long distances.
Generally speaking, the plant had to make provisions for various necessary plant operation modes and develop an overall process engineering concept with the plant. The goal was to improve the automation level compared to the original status.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.