INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Albbruck, Germany
System/Technology: Siemens PCS7 incl. F-Systems
Services: Commissioning, Project management, Documentation, As-built status and data recording, Basic-engineering and pre-engineering, Detail engineering, Installation supervision
Industry Branch/Type of Plant: Power plants, Industrial systems
Client: Albbruck paper plant
Project Size: approx. EUR 1 m
Within the Myllykoski Group, MD Albbruck is the location for the production and development of offset papers. With about 630 employees and three paper machines, it is the largest site within Myllykoski Continental. Each year, about 300,000 tons of woody, coated printing paper is produced. A dedicated power plant is used to generate electricity, water, and process steam.
INP International Projects was contracted to equip Boiler 6 of the steam power plant with the Siemens PCS7 controls system. Boiler 6 was built in 1981 by Sulzer, and has six burners and three coal pulverizers. The burners run on anthracite, heavy heating oil, and light heating oil. The boiler also has a grate stoker furnace, where tree bark and effluent sludge are burned. The maximum output of Boiler 6 is about 120 t/h at 150 bar. The steam generated in the boiler systems is used to drive various turbines, or the turbine bypass reducer stations, depending on the mode of operation. It is finally reduced to 1.5 bar. INP International Projects provides planning, engineering, and integration of existing systems into the new controls systems, and recommissioning of the system.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.