Knut Mertens
Managing Director
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
knut.mertens@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Mannheim, Germany
System/Technology: Large heat pump/Planning E-technology
Services: Project management, Basic-engineering and pre-engineering
Industry Branch/Type of Plant: Green Energy, Infrastructure Projects, Large Plants
Client: Großkraftwerk Mannheim AG
Activity period: 2022
The „energy and heat transition“ in Germany is being actively promoted at GKM Mannheim. As one of the first implemented and funded projects, the large-scale heat pump in the Mannheim district heating network was planned and excecuted as part of a large-scale government project. Here, district heating is generated in an environmentally friendly manner by means of electrically operated large heat pump systems. Environmental heat (here: Rhine water) is available as a heat source. The district heating network return temperature is raised from approx. 60°C to a supply temperature of approx. 90°C to 130°C. The planned heat pump module has a heating capacity of approx. 20 MWth. Only 7 MWel of electricity is required for operation. The remaining power will be taken from the environment.
INP was commissioned to plan and tender the electrical connection of the large-scale heatpump.
INP has prepared the technical specification for the electrical own consumption. Furthermore, a network analysis (short circuit and load flow calculation) was prepared.
The planning of the electrical connection of the large heat pump to the 10 kV existing grid includes the following essential areas:
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.