Thomas Jäger
Managing Director
INP Schweiz AG
Spinnereistrasse 3
5300 Turgi
Switzerland
Tel. +41 56 552 19 00
thomas.jaeger@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Kafue Gorge, Zambia
Services: Commissioning, Project management, Quality assurance, Site management, Documentation, As-built status and data recording, Pre-project planning and tendering, Basic-engineering and pre-engineering, Detail engineering, Installation supervision
Industry Branch/Type of Plant: Green Energy, Transmission & Distribution, Power plants
Client: Zesco, Zambia, through Comelex and ABB High Voltage
Project Size: > SFR 1 M
Activity period: 2004 - 2007
The power plant switch gears and high-voltage systems in Kafue Gorge are the largest energy provision systems in central Africa. The Kafue Gorge hydroelectric plant and the 330kV high-voltage distribution system began operations in the early seventies, making them over 30 years old. On the high voltage side, in the early nineties, a power grid system was added, and in the mid-nineties, a new high-voltage control system; at the beginning of the millennium, a new high-voltage protection system was commissioned. No renovations had been made to the primary systems since the plant was built. On the power plant side, a new power plant controls system was also commissioned in the mid-nineties. No renovations had been made to the generator switch, the power plant switching system, the power transformers, or the generator protection system since the plant was commissioned. The operating company, ZESCO, Zambia, had decided on a general overhaul of the high-voltage primary system and the power plant switching system, as part of the general overhaul of the power plant turbines. Some of the individual system components were also to be completely renovated, and some only modified. With the help of our consultant, SwedPower, ZESCO generated the concept for converting the plants, and contracted with a consortium for its implementation via an international request for proposals. INP took on the project planning of the open-air switchyard, and part of the power plant switch gears, as a sub-contractor of a consortium partner (ABB). The project planning job included all associated planning and renovation phases, as well as site and installation management, startup of the primary side components of the high-voltage equipment. In the course of project implementation, INP took on the role of an external consultant, and pointed out to the operating company, ZESCO, and to the customer consultant SwedPower, weak points in the project planning and execution of the secondary side system components, as well as problems with interfaces. INP then generated a new concept for all of the secondary side systems, taking into consideration which sub-systems could be re-used, and which required replacement.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.
Further information regarding cookies in this website can be found in our privacy policy