Jürgen Wilkening
PoA - Business Development Manager
INP Deutschland GmbH
Werkstrasse 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
juergen.wilkening@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Höchst, Germany
System/Technology: 800xA AC800M
Services: Commissioning, Project management, Basic-engineering and pre-engineering, Detail engineering, Maintenance
Industry Branch/Type of Plant: Waste incineration systems, Power Generation
Client: T2C / Infraserv Höchst
In 2009, a substitute fuel combustion plant (SFCP) was built on the premises of Höchst. It consists of three boiler lines, which operate according to the fluidized bed process, and a connected steam turbine.
INP Deutschland GmbH was involved in various projects over the entire period. The first project was the initial commissioning of the newly built plant. INP was involved in the jobs of all process areas with the exception of the turbine plant section.
After a successful startup, INP continued to be responsible for the control technology support of the 800xA system. This included the following tasks: Maintenance of the system, programming and commissioning of changes to the system upon customer request. During this time, Infraserv was also assisted by INP in the development of concepts for the conversion of all three boiler lines with flue gas recirculation to optimize the combustion process.
Together with ABB, INP was eventually commissioned to implement and operate the process control conversion for the recirculation of the flue gas. Furthermore, INP was responsible for the coordination of all subcontractors (such as suppliers for fabric filters, frequency converters, motors and assembly) or assisted Infraserv with this coordination.
Even after this extensive conversion, INP continued to provide service and maintenance regarding the same tasks mentioned above. In addition to the day-to-day business activities of the company, there were various small projects, such as the conversion of the steam reduction stations and the connection of the plant to the secondary control power.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.