Michael Ohmer
Head of Energy and Heat Supply
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
michael.ohmer@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Düsseldorf, Germany
System/Technology: Hydrogen production
Services: Solution development / Feasibility studies
Industry Branch/Type of Plant: Green Energy
Client: Stadtwerke Düsseldorf
Activity period: 2023
Stadtwerke Düsseldorf (SWD) has planned to decarbonize its electricity and heat generation by 2035 in line with the city of Düsseldorf‘s targets. In addition to electricity generated from renewable sources, primarily wind power and PV systems, conventional power plants are only to be used to generate balancing energy.
The main political approach for this balancing power generation is that surplus electricity generated from renewable sources in particular will be used to generate hydrogen as a renewable fuel that can be temporarily stored in salt caverns and made available from the storage facilities via a hydrogen network (European backbone) that is currently being developed.
Hydrogen will be used in new high-hydrogen-capable power generation plants that can be converted to 100% hydrogen. The use of hydrogen to cover peak heat demand is being examined. In addition, the hydrogen requirements of customers in the urban area are being determined for various applications.
The political plan is to source the primarily green hydrogen both internationally and to produce it nationally by electrolysis. According to the current expansion plans for the hydrogen network, it can be assumed that this will be usable at the Lausward power plant site from 2030. Due to its location and diverse connections, the Lausward power plant site is in principle able to play a role in national hydrogen production and in meeting the hydrogen requirements of SWD and other customers in Düsseldorf.
The aim of this feasibility study was to investigate the technical and economic feasibility of electrolysers of different sizes at the Lausward power plant site. Sizes of 5, 20 and 100 MWel were examined.
The following focal points were considered in the feasibility study:
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.