SHARE

We wish you a merry and
joyful Christmas Season
and a good start into the
New Year!

  • Strong amongst German SMEs

    We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.

    Georg Jester – General Manager
  • Green Energy Geothermie
  • Focus on our customers

    Professionalism and reliability are what our customers appreciate. And this has been so for over 30 years.

    Andreas Haaß – Managing Director
  • HGÜ HVDC Offshore Sylwin
References   /  Atatürk – Hydroelectric Power Plant

Atatürk – Hydroelectric Power Plant

Location: South-east Anatolia, Turkey

Services: Project management, Pre-project planning and tendering, Basic-engineering and pre-engineering, Detail engineering

Industry Branch/Type of Plant: Green Energy, Power Generation, Power plants

Client: ABB Switzerland

Tasks

The project area concerns the region between the Euphrates and Tigris rivers. What is now ABB Switzerland was given the contract to supply the entire plant. This involved planning and implementing the medium and low-voltage power supply by workers who are now INP employees.

Project description

The Atatürk hydroelectric power plant is the sixth largest hydroelectric plant in the world, and was inaugurated in 1994. It is regarded as a key plant in the south-east Anatolia project (GAP), and is its largest energy supplier. GAP is the largest and most varied development project in Turkey.

Points of contact

Harald Knaus Leiter Elektrotechnik

Harald Knaus

Head of Electrical Engineering

INP Deutschland GmbH

Werkstraße 5

67354 Römerberg

Germany

Tel. +49 6232 6869-0

harald.knausnoSpam@noSpaminp-e.com

More references