Michael Ohmer
Head of Energy and Heat Supply
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
michael.ohmer@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Helgoland, Germany
System/Technology: Hydrogen
Services: Solution development / Feasibility studies
Industry Branch/Type of Plant: Green Energy, Power Generation
Client: Versorgungsbetriebe Helgoland GmbH (local utility operator)
Activity period: 2022
Three projects in the AquaVentus family have joined forces for an initial project to supply the island of Helgoland with climate-neutral heat using green hydrogen: AquaPrimus (offshore electrolysis), AquaDuctus (pipeline) and AquaCore (local direct utilization).
In the value chain, an offshore wind turbine (WT) with electrolysis unit from the AquaPrimus subproject will be installed in the area of the wind farms off Helgoland. It autonomously produces green hydrogen for local direct applications. The electricity for electrolysis is generated directly from the WTG. Surplus electricity from the WTG will be transported to the mainland by cable. Using an innovative hydrogen pipeline from the AquaDuctus project, the green hydrogen produced will be piped directly to the Helgoland utilities after landing at the Nordostbohlwerk. There it will be converted into heat and fed into the district heating network.
The AquaCore schedule is based on the AquaPrimus and AquaDuctus subprojects. Realization is scheduled to take place by 2026.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.