Jürgen Wilkening
PoA - Business Development Manager
INP Deutschland GmbH
Werkstrasse 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
juergen.wilkening@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Milan, Italy
System/Technology: ABB Advant
Services: Commissioning, Documentation, Basic-engineering and pre-engineering, Detail engineering, Installation supervision
Industry Branch/Type of Plant: Power Generation, Waste incineration systems
Client: Siemens PGI
Project Size: EUR 200,000
Since 2001, AMSA has operated a thermal waste treatment plant, SILLA2.
The plant has three furnace lines with a total capacity of 42 tonnes/h. This means 75 tonnes/h steam is supplied to a steam turbine at a temperature of 440 °C and 52 bar pressure. The electrical power output of the steam turbine is 59 MW. The operator exchanged part of the existing turbine protection system due to inadequate availability. It is a non-ABB system, the so-called TURMON (turbine monitoring). The newly installed turbine protection system is based on the ABB Advant system AC160, and is installed under the ABB Advant control system AC450 with AS 500 OS.
The task for INP International Projects involved exchanging the TURMON
system and integrating components related to ABB Advant. Initially the existing TURMON system was investigated and alternatives to the existing configuration were developed so that existing interfaces both to the field level and also the turbine protection system could be adopted with as few changes as possible.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.