References   /  Amager Resource Center - New Construction of Waste-fed Heating and Power Plant II
Amager Resource Center - New Construction of Waste-fed Heating and Power Plant II

Amager Resource Center - New Construction of Waste-fed Heating and Power Plant II

Location: Kopenhagen, Denmark

System/Technology: Siemens SPPA T3000; Tec4fde

Services: Commissioning, Documentation, Basic-engineering and pre-engineering, Detail engineering

Industry Branch/Type of Plant: Power Generation, Waste incineration systems

Client: LAB France

Project description

LAB delivers the flue gas treatment equipment for the new construction of a waste-fed heating and power plant in Copenhagen. INP Deutschland GmbH received the order for the software and hardware planning of the entire scope of delivery.

INP Services

Software planning

The software programming and operator screen creation will be carried out at INP
Deutschland in Römerberg. The required access to the T3000 application server on the
system takes place via a VPN remote connection.

  • Software programming
  • Fail-safe programming
  • HMI image creation

Hardware planning

The hardware planning will be carried out at INP Deutschland in Römerberg. The required access to the tec4fde database on the system takes place via a VPN remote connection.

  • Hardware planning with the planning tool Siemens Tec4fde
  • Typical creation
  • Documentation creation

Factory Acceptance Test (FAT)

The FAT is performed autonomously by the customer. Every function is tested here by using simulations. INP provides technical system support.

  • Development and integration of simulation-capable Macros
  • Support for planning changes

Commissioning

  • Implementation of cold commissioning
  • Implementation of hot commissioning
  • Support during the test run via remote access

Global Mobility

  • Management of international fiscal and registrative requirements

Points of contact

Michael Kopp Leiter Projektmanagement

Michael Kopp

Head of Project Management

INP Deutschland GmbH

Werkstraße 5

67354 Römerberg

Germany

Tel. +49 6232 6869-0

michael.koppnoSpam@noSpaminp-e.com

More references