Michael Ohmer
Head of Energy and Heat Supply
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
michael.ohmer@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Bad Säckingen, Germany
System/Technology: Regenerative heat generation
Services: Solution development / Feasibility studies
Industry Branch/Type of Plant: Green Energy, Power plants
Client: Schluchseewerk AG
Activity period: 2022-2023
Schluchseewerk AG operates a pumped storage power plant with 4 machine sets (consisting of generator, turbine and pump) at the Bad Säckingen site. During operation, waste heat is generated at the bearings and in the generators, which is released into a cooling water system that is fed with Rhine water.
Stadtwerke Bad Säckingen is planning and implementing a new district heating sub-network to supply the Leimet III development area. 208 residential units are to be built here. In addition, the neighboring Waldbad swimming pool is to be supplied with heat in summer.
Due to the proximity to the Säckingen cavern power plant, it makes sense to integrate the waste heat from the cavern power plant here.
The aim of this project study was to determine the technical and economic feasibility with regard to the available heat potential in the Säckingen cavern power plant, with a view to feeding it into the Leimet III district heating network.
The project study focused on the following areas:
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.