SHARE
  • Strong amongst German SMEs

    We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.

    Georg Jester – General Manager
  • Green Energy Geothermie
  • Focus on our customers

    Professionalism and reliability are what our customers appreciate. And this has been so for over 30 years.

    Andreas Haaß – Managing Director
  • HGÜ HVDC Offshore Sylwin
References   /  Waste heat extraction cavern power plant

Waste heat extraction cavern power plant

Location: Bad Säckingen, Germany

System/Technology: Regenerative heat generation

Services: Solution development / Feasibility studies

Industry Branch/Type of Plant: Green Energy, Power plants

Client: Schluchseewerk AG

Activity period: 2022-2023

Project description

Schluchseewerk AG operates a pumped storage power plant with 4 machine sets (consisting of generator, turbine and pump) at the Bad Säckingen site. During operation, waste heat is generated at the bearings and in the generators, which is released into a cooling water system that is fed with Rhine water.
Stadtwerke Bad Säckingen is planning and implementing a new district heating sub-network to supply the Leimet III development area. 208 residential units are to be built here. In addition, the neighboring Waldbad swimming pool is to be supplied with heat in summer.
Due to the proximity to the Säckingen cavern power plant, it makes sense to integrate the waste heat from the cavern power plant here.
The aim of this project study was to determine the technical and economic feasibility with regard to the available heat potential in the Säckingen cavern power plant, with a view to feeding it into the Leimet III district heating network.

INP Services

The project study focused on the following areas:

  • Estimation of the available heat quantity with subsequent measurement campaign to specify the actual quantities available 
  • Development of a concept for heat extraction and, if necessary, return of the water volume to the cooling water circuit
  • Determination of the possible integration points
  • Design of the heat pump
  • Determination of the required/available installation area
  • Determination of the necessary construction measures
  • Dimensioning of the main components required, such as pumps, pipes, etc.
  • Concept for integration into the district heating network
  • Estimation of the investment costs
  • Consideration of amortization periods for the investment, taking into account the alternative heat generation and production costs, as well as taking into account possible subsidy regimes

Points of contact

Michael Ohmer Leiter Energie- und WärmeVersorgung

Michael Ohmer

Head of Energy and Heat Supply

INP Deutschland GmbH

Werkstraße 5

67354 Römerberg

Germany

Tel. +49 6232 6869-0

michael.ohmernoSpam@noSpaminp-e.com

More references